Recent work:
- Foundation leveled: Long awaited and much anticipated! 35 new piers installed with no damage inside and no more noticeably sloped floors! The house was raised 4 inches in some places to bring it to level.
All the trash cleared from underneath and the old siding off = less moisture underneath and
less mildew smell.
less mildew smell.
The dreaded and monstrous trash pile.
New horizontal boards for under-deck skirting, in the process of going up.
We're very pleased with the look.
- Septic system: Fixing it was unexpected (and un-budgeted), but with a new pump, it's probably in the best working order, ever! It required removing the deck on the front of the house, outside the guest room, which we've decided not to replace.
- Plumbing: New plumbing lines throughout, to replace the existing sprinkler pipe (!) and two new bathrooms (only one budgeted for), laundry and kitchen sink. Here's the master shower we tiled last weekend.
- New cabinets and appliances: Are installed, now just waiting on counter tops.
- Flooring: Completed master bath the same as upstairs.
- Painting: I'm using chalk paint for the first time. The dresser and the kitchen chairs which were left behind by the old owners have been updated. It's pretty amazing what a difference paint can make! Kitchen table is next.
Peyton came on a wet one, so they challenged themselves to 'change a different color'.
Mission accomplished. Once again, the lake flooded over the sea wall and our dock; the third time this season.
Amelia
With Kayli and pudding, not mud.
Nilla taking a break at her just right sized window.







No comments: